Case Studies > CAE Software > Ebara International Corporation

Ebara International Corporation




Requirement
Ebara sought to develop a novel hydraulic turbine, the mechanical concept of which was based on submerged LNG pumps in cryogenic service. Many new aspects required analysis to determine the optimum thermodynamic efficiencies across various operating conditions.
 
CN Solution
Using CCAD and CFD in CN’s Agile Engineering Design System® it was possible to conceive and test the design before installation to ensure maximum turbine efficiency, thereby increasing productivity of the liquefaction process and providing the ability to recover fluid energy as electrical power.
 
Benefit
CFD identified several areas for potential inefficiencies in the flow field that could be easily and quickly re-engineered before any manufacturing, saving considerable costs and maximising ROI. In total six turbines and critical components were successfully developed.

Webinars

Throughflow Solver Methods and Recent Upgrades in the Concepts NREC Agile Suite
September 4, 2014
11:00 AM EDT
Register Now>