Case Studies >
Engineering >
Society of Petroleum Engineers
Society of Petroleum Engineers
Requirement
Less costly surface facilities (at the North Slope oil fields and other world locations) to process, compress, and reinject the excess gas produced.
CN Solution
Develop a new downhole gas compressor and turbine expander that operates on excess production pressure.
Benefit
Additional gas injection capacities can be introduced at a fraction of the capital cost of traditional surface equipment.